paved40 cm total depth
| Total Depth | 40 cm |
| Base Density | 1 |
| Shoulder Width | 0.5 m |
| Shoulder Density | 0.9 |
Civil engineering cross-sections and physics rules for all 5 road standards in roads.toml. Each profile features its material layer stack drawn to scale with compaction and gradient thresholds.
| Total Depth | 40 cm |
| Base Density | 1 |
| Shoulder Width | 0.5 m |
| Shoulder Density | 0.9 |
| Total Depth | 25 cm |
| Base Density | 0.9 |
| Total Depth | 40 cm |
| Base Density | 0.9 |
| Break Factor | 0.3 |
| Total Depth | 10 cm |
| Base Density | 0.85 |
| Total Depth | 15 cm |
| Base Density | 1 |
[grade]Maximum slope thresholds allowed during terrain grading and road laying:
| Parameter | Slope Limit | Percentage |
|---|---|---|
Maximum Grade (max) | 0.08 | 8 % |
Main Road Grade (main) | 0.06 | 6 % |
[bridge]Structural requirements for river and valley bridge spans:
| Component | Dimension |
|---|---|
| Structure Material | concrete |
Deck Thickness (deck) | 0.6 m |
Vertical Headroom (headroom) | 4.5 m |
Pier Spacing (spacing) | 12 m |
Pier Width (pier) | 1 m |
Water Clearance (clear) | 2.5 m |
Safety Barrier Height (barrier_height) | 0.8 m |
Max Bridge Grade (grade) | 4 % |
[ditch], [culvert], [poles], [verge]| Width | 4.8 m |
| Depth | 0.6 m (max 1.2 m) |
| Fall Grade | 0.5 % |
| Vegetation | ditch |
| Bore Diameter | 0.4 m |
| Cover Thickness | 0.25 m |
| Flow Speed | 3.5 m/s |
| Max Span | 30 m |
| Verge Material | topsoil |
| Verge Thickness | 0.3 m |
| Pole Uproot Threshold | 0.3 |
| Sidewalk Depth | 0.25 m |